Zane Middle School permeable concrete 3

Abstract

The purpose of the project was to replace a failing permeable pathway (Fig 1) at Catherine Zane Middle School in Eureka, CA with a functioning permeable pathway. The previously installed pathway was uneven, impermeable and produced undesirable loose gravel. The new path was successfully implemented and the middle school now has a solid, level, and permeable concrete pathway in the Peace Garden.

Date

Spring 2018

Department

School of Engineering

Concentration/Emphasis

ENGR 215 — Introduction to Design

Advisor/Professor

Lonny Grafman