Abstract

The lime-plastered hempcrete wall at CCAT is part of the reclamation station made to store materials for community members to use. It was designed and built in the spring of 2024 to protect the hempcrete from weather/water damage as well as to protect it from wear and tear from regular use.

Date

Fall 2024

Department

School of Engineering

Concentration/Emphasis

ENGR 205 — Introduction to Design

Advisor/Professor

Lonny Grafman

Included in

Engineering Commons

Share

 
COinS