Abstract
The lime-plastered hempcrete wall at CCAT is part of the reclamation station made to store materials for community members to use. It was designed and built in the spring of 2024 to protect the hempcrete from weather/water damage as well as to protect it from wear and tear from regular use.
Date
Fall 2024
Department
School of Engineering
Concentration/Emphasis
ENGR 205 — Introduction to Design
Advisor/Professor
Lonny Grafman