CCAT earthen beautification 2024

Abstract

The earthen beautification project at the Campus Center for Appropriate Technology (CCAT) [...] These areas encompass the cobb oven, the banana slug structure, the heated cobb bench, and their immediate surroundings. This project was completed in spring of 2024 and was made for the use of students.

Date

Spring 2024

Department

School of Engineering

Concentration/Emphasis

ENGR 205 — Introduction to Design

Advisor/Professor

Lonny Grafman

https://www.appropedia.org/CCAT_earthen_beautification_2024

Share

 
COinS