Zane Middle School permeable concrete 2
Abstract
The Eco Team designed and built a semi permeable walkway for our client at Zane Middle School. They needed a pathway that will drain well, keep students from walking through the parking lot, and will withstand high foot traffic. We started by evaluating different materials that could be used to build a walkway. The constraints for building materials we considered were safety, cost, environmental impact, drainage and aesthetics.
Date
Spring 2016
Department
School of Engineering
Concentration/Emphasis
ENGR 215 — Introduction to Design
Advisor/Professor
Lonny Grafman