Authors

Susie Van Kirk

Publication Date

3-2015

Abstract

The first phase of the City of Fortuna’s Rohner Creek flood control project will involve channel modification, widening, and bank stabilization to reduce flooding of bordering properties. Three private bridges that provide access to residences will be replaced. Also proposed is rocking along the toe of the Main Street culvert. To comply with the California Environmental Quality Act, Section 15064.5, (CEQA), the bridges were photographed and assessed. Although no impacts are anticipated to the false-front building at the Main Street culvert, its history was researched.

Share

Article Location

 
COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.