Publication Date
3-2015
Abstract
The first phase of the City of Fortuna’s Rohner Creek flood control project will involve channel modification, widening, and bank stabilization to reduce flooding of bordering properties. Three private bridges that provide access to residences will be replaced. Also proposed is rocking along the toe of the Main Street culvert. To comply with the California Environmental Quality Act, Section 15064.5, (CEQA), the bridges were photographed and assessed. Although no impacts are anticipated to the false-front building at the Main Street culvert, its history was researched.