Zane Middle School rainwater gutter fix
Abstract
The purpose of this project is to solve the awning drainage problem at Zane Middle School. Team Livewire created a replicable, integrated gutter box called the Streamline which is installed between the gutter downspout and serves as a direct drain and a surge tank. The Streamline, if deemed successful, will be implemented on other awning rainwater drainage systems throughout the campus.
Date
Spring 2015
Department
School of Engineering
Concentration/Emphasis
ENGR 215 — Introduction to Design
Advisor/Professor
Lonny Grafman