Zane Middle School Grounds Work Mulch Makeover
Abstract
Trevor Hammons, a supervisor at Zane Middle School in Eureka, CA requested to renovate a rectangle in front of the school, which was made up of mulch and a few pitiful plants, by making it more presentable and useful for the students. Team Work, a group of aspiring environmental engineers from the spring semester Engineering 215 class, was up for the task. By planting ceanothus and azaleas with care, the rectangle was transformed into a much more aesthetically pleasing space for the students.
Date
Spring 2017
Department
School of Engineering
Concentration/Emphasis
ENGR 215 — Introduction to Design
Advisor/Professor
Lonny Grafman
https://www.appropedia.org/Zane_Middle_School_Grounds_Work_Mulch_Makeover