Abstract
For the Spring Semester 2025, Engineering 205 final project, the MaJOR team was assigned to create a temporary level surface for the wood saw. After multiple years of arguing, Cal Poly Humboldt finally purchased a wood saw, however due to construction, they had to find a temporary placement for it. The MaJOR team was commissioned by the SWETMAN Makerspace to create a temporary structure that could be easily removed in two years and provide a level surface for the wood saw.
Date
Spring 2025
Department
School of Engineering
Concentration/Emphasis
ENGR 205 — Introduction to Design
Advisor/Professor
Lonny Grafman