Abstract
The purpose of this project was to redesign the triangular area in front of Catherine Zane Middle School, Eureka CA. A new, even path made of aggregated concrete in a solid Z-shape was implemented, along with three planters made of the repurposed concrete from the former path.
Date
Spring 2019
Department
School of Engineering
Concentration/Emphasis
ENGR 215 — Introduction to Design
Advisor/Professor
Lonny Grafman