Abstract

See how Zane Middle School solved their gutter issues creatively on Appropedia. The objective of this project was to create and implement a system that sealed the existing holes in the gutters of Zane Middle School and prevent future clogging. The solution, Fix the Flow, involved cutting the edge of the existing gutter and building pieces that patched the hole and created an angled slope and wider surface area for the water to fall into from the gutter on the roof. This will simultaneously solve the leaking problem and prevent the gutter from clogging and overflowing.

Date

Spring 2016

Department

School of Engineering

Concentration/Emphasis

ENGR 215 — Introduction to Design

Advisor/Professor

Lonny Grafman

Included in

Engineering Commons

Share

 
COinS